TAL Group

DecisionBrain leveraged sophisticated optimization algorithms to implement a customized solution that allowed HIT to improve key operational metrics.

Ajover case study production line

Ajover

DecisionBrain was tasked with implementing an integrated supply chain planning and production scheduling software specially designed for their needs.

JLL & Integral

The challenge provided to DecisionBrain was how they could take their engineer field service distribution to higher productivity levels with optimization and dynamic scheduling tools.

Serco

In this customer case study, we discuss Serco and DecisionBrain working together to optimize the London Cycle Hire Scheme, one of the largest in the world.