DecisionBrain Gene

The development platform that cuts decision optimization app development effort by over 70%

Reduce development costs by over 70%

Out-of-the-box capabilities used across modern applications

  • Advanced web User Interface (UI)
  • What-if scenario analysis capabilities
  • Integrated user management
  • Parallel processing and execution monitoring
  • Containerized deployment (deploy locally or on the cloud)
  • Integrated security features
Speak with an Expert

Components

Web Frontend Service

Web User Interface easily configurable to your business needs with predefined elements and seamless integration of custom components.

  • Real-time dashboard widget synchronization with scenario data
  • Comprehensive set of ready-to-use components

Scenario Service

Keep your decision-making work organized with a flexible hierarchy of workspaces, folders, and scenarios. A clean API lets your team create, rename, duplicate, and delete scenarios effortlessly — so you can structure projects the way your business actually works.

A screenshot of the DecisionBrain Gene Scenario Manager interface showing a hierarchical file structure. The "March data" folder is expanded, revealing a list of data scenarios with details like Creation Date, Author (gene_admin), and a status column highlighting several "Error" notifications and job logs.

Data Service

Store and manage all your scenario data in a structured relational database, with every dataset cleanly scoped to its scenario. A developer-friendly API gives you full control over your data:

  • Inspect and understand database structure at a glance
  • Create, read, update, and delete records with ease
  • Map database records directly to in-memory objects for fast processing

Security

DB Gene ensures high-level security to protect your data:

  • DB Gene supports standard protocols (OpenID Connect, OAuth 2.0 and SAML 2.0) making it possible to implement Single-Sign-On and to connect to existing user directories
  • Enterprise-grade security with Role-Based Access Control (RBAC): control what scenarios, visualizations, and interactions are accessible on a per-role basis
  • Support for https encrypted communication
A screenshot of the DB Gene Application Management interface specifically showing the "Permissions" dashboard. The UI illustrates a sophisticated Role-Based Access Control (RBAC) system where an administrator (gene_admin) can toggle specific access, modify, create, and delete rights across various application elements like Workspaces, Scenarios, Dashboards, and Jobs. The clean, professional layout highlights the granular security settings that ensure sensitive decision-making data is only accessible to authorized personnel.

Optimization Server (DBOS)

Seamlessly runs multiple CPU-intensive computational jobs locally or remotely and provides administrative tools to easily monitor and manage them.

  • Predefined Web Console
  • Monitor and replay execution capabilities
  • Flexible deployment, local or on the cloud
  • Failover capabilities
A screenshot of the DB Gene Optimization Server (DBOS) dashboard showing a completed computational job (Job ID: 69f227...). The interface features a "Job Execution Chart" that tracks real-time KPIs such as objective value, tardiness, and task percentages over time. Below the chart, a "Job Logs" terminal provides detailed execution data, while a circular progress gauge and status badges indicate a successful 304-second run. The sidebar highlights navigation for Job Execution, Tasks, and Job Creation.
Kubernetes Logo
Spring boot Logo
Python Logo
IBM Cplex Logo
OPL Logo
Docker Logo
Scaleway
Google Cloud
IBM Cloud
Azure
DigitalOcean
aws

DecisionBrain Gene Datasheet

DBOS: The Optimization Server Powering DB Gene

DBOS is DB Gene’s dedicated optimization server, built to run even the most demanding computational workloads. It delivers real-time execution insights, smart resource sharing, and seamless solver integration—turning complex models into fast, scalable decisions.

Monitor Real-time Executions

DBOS orchestrates multiple CPU-intensive computational jobs and provides an interactive web console to monitor and manage them. Retrieve information of past runs and replay the execution in a click.

Share CPUs and Solver Licenses

Maximize utilization of CPUs and costly optimization solver licenses by sharing them securely across users and applications.

Bring Your Own Solver

DBOS can be integrated with any optimization solver (e.g. IBM CPLEX, Gurobi) and any other types of analytics technology (e.g. Machine Learning, Artificial Intelligence, cognitive): confidently turn data insights into business action leveraging best-in-class technology.

Scalable Architecture

Modular and Scalable Architecture Based on State of the Art Technology

READY-TO-USE SERVICES
AVAILABLE TEMPLATES
CUSTOMIZABLE
DATABASES

Access the Documentation and Release Notes

Strong Benefits for your Teams

Bluesky